Carbon and industrial process

Removing CO2 from the air, and making cement, steel and chemicals without emitting it.

Cement, steel and chemicals release CO2 from their chemistry and from high-temperature heat, not only from the power they use. Some of that can be captured at the chimney and stored underground. The rest has to be offset by pulling CO2 back out of the air. Each approach on this page tries to do one or the other at a cost per tonne someone will pay.

Contracts are far ahead of delivery.
About 50 million tonnes of durable carbon removal have been contracted and about 1.7 million delivered, roughly 3%. One buyer accounted for about 78% of contracted tonnes as of April 2026. We track delivered, verified tonnes.
Costs are still above policy prices.
Disclosed removal prices mostly run from about $200 to over $600 per tonne, against a US tax credit of $85 to $180 and a European carbon price near €86. Suppliers surveyed in a study published in January 2025 put their 2030 breakeven at about $140 to $340 per tonne.
Policy support is being trimmed, not withdrawn.
The US kept its carbon capture tax credit and two large direct air capture hubs. It cancelled industrial grants and shortened the hydrogen credit. Europe began applying its border carbon price in 2026 and has proposed a slower path for its carbon market.
First plants are behind schedule.
The large direct air capture, cement capture and green steel projects have all started later or produced less than planned. Most tonnes delivered today come from biomass-based methods such as biochar.

What would change our view

  • Delivered durable removal passes 1 million tonnes in a single calendar year, or 10% of cumulative contracted tonnes, by end-2027.
  • A direct air capture or cement capture plant (Stratos, Brevik) publishes verified output at or above 80% of design for 12 consecutive months.
  • A policy shift. A cut to the US 45Q credit, or EU border-price certificate sales delayed beyond February 2027, would count against our view; folding permanent removals into the EU carbon market, with funded purchases, would support it.

Map

Scoreboard Delivered tonnes: CO2 actually removed or stored and independently verified. Contracted tonnes and plant capacity don't count. As of October 2026, about 50.5 million tonnes of durable removal had been contracted and 1.7 million delivered. First plants run well below nameplate, and gross capture omits a plant's own energy use.

Range of disclosed purchase prices by removal method from one buyer collective (Frontier), with a dot at the published average and ticks at individual deals. Hollow bars are supplier survey expectations, which are not trades. Vertical lines: US 45Q credit for point-source capture ($85) and direct air capture ($180), the EU carbon auction price (€86, plotted at an assumed $1.16 per euro) and the market-wide weighted average ($343). Log scale, since prices span more than tenfold.

First-of-a-kind plants: originally announced start (left) and actual or current expected start (right); the line between is the slip. Sublime's cement plant was paused after its federal grant was cancelled. Latest output against design: Mammoth 675 t of net removal in the first half of 2026 against 36,000 t a year; Brevik about 105,000 t stored from August 2025 to May 2026 by one investigative account, against 400,000 t a year, while the company says it is now near full capacity.

Players

Listed companies, or units of them, that operate or supply plants in scope. Private companies are included if they have delivered independently verified removal tonnes, operate or are commissioning a commercial-scale first plant for a paying customer, or are building one with financing closed and public support in force. Sublime Systems, Boston Metal and Heirloom don't meet that bar yet. Funding amounts are left out.

1PointFiveunit of Occidental, NYSE: OXY
Direct air capture · Stratos, 500,000 t a year design; no CO2 injected yet. Full commissioning expected around year-end 2026; its South Texas hub kept federal support in April 2026.
Heidelberg Materialslisted, XETRA: HEI
Cement with capture ·Brevik, 400,000 t a year design; output disputed (see chart). A second capture project, at Padeswood in the UK, is under construction.
Northern Lightsjoint venture of Equinor, Shell and TotalEnergies
CO2 shipping and offshore storage · 35,914 t injected by 15 Dec 2025. Phase 1 capacity of 1.5 million t a year is booked; phase 2 expected in 2H28.
Ørstedlisted, Nasdaq Copenhagen: ORSTED
Bioenergy with capture · 430,000 t a year design across two plants, Kalundborg and Avedøre; operating from 2027. Backed by a 20-year Danish state contract.
SSABlisted, Nasdaq Stockholm: SSAB A
Electric arc furnace steel · Oxelösund start set for 2Q27 (Jun 2026, reaffirmed Oct 2026). The date slipped after appeals against a power-line permit; Luleå converts in late 2029.
SLB Capturiunit of SLB, NYSE: SLB
Capture plant supplier · Capture units running at Brevik; units under construction for Kalundborg. Supplies the equipment and does not own the plants.
LanzaTechlisted, Nasdaq: LNZA
Gas fermentation of industrial off-gas and waste · Commercial plants operating in Asia and Europe, turning carbon-rich off-gas into ethanol and chemicals.
Climeworksprivate
Direct air capture (solid sorbent) ·675 t of net removal at Mammoth in 1H26. Up from 119 t a year earlier; partner in a US direct air capture hub.
Deep Skyprivate
Direct air capture test and storage site ·First verified direct air capture credits issued (Jun 2026). Alberta site with a 3,000 t a year design.
Exomad Greenprivate
Biochar · About 415,000 t delivered (CDR.fyi, Nov 2026). Bolivia; one of the two suppliers that delivered most tonnes in 1Q26.
Varahaprivate
Biochar; enhanced weathering ·About 181,000 t delivered (CDR.fyi, Nov 2026). Projects across South Asia.
Vaulted Deepprivate
Biomass slurry injection ·Delivering verified tonnes recorded by CDR.fyi. Houston; injects organic waste deep underground.
Charm Industrialprivate
Bio-oil injection ·Delivering verified tonnes recorded by CDR.fyi. Converts crop waste to oil and injects it underground.
Planetaryprivate
Ocean alkalinity enhancement ·Delivered marine removal tonnes in 1Q26. Nova Scotia; offtake with Frontier for 2026 to 2030.
O.C.O Technologyprivate
Mineralization of industrial residues ·Delivered tonnes in 1Q26. UK; makes aggregate from waste ash and CO2.
Stegraprivate
Hydrogen-reduced iron and steel · Boden plant under construction; no steel produced yet. Said on 30 September 2026 that it needs more capital to finish Boden, and appointed a new chief executive.
Rondo Energyprivate
Thermal battery for industrial steam ·100 MWh unit operating since Oct 2025. Stores electricity as high-temperature heat; a unit also runs at a Thai cement plant.
Antora Energyprivate
Thermal battery for process heat · 5 GWh system commissioning from May 2026. The heat is sold under a long-term offtake.

Resources

CDR.fyi
Independent tracker of durable carbon removal purchases, deliveries, prices and suppliers.
Carbon Herald
Daily news on carbon removal, capture and storage, low-carbon materials and carbon markets.
The State of Carbon Dioxide Removal
Independent scientific assessment of removal deployment, costs, investment and policy, with open data.
IEA CCUS Projects Explorer
Database of capture, transport, storage and utilisation projects worldwide.

Notes

As of 3 November 2026. Figures come from company reports, regulators and independent trackers; where a plant's output is disputed, both accounts are given. Delivered tonnes are self-reported to CDR.fyi and not all have been retired on a registry. Gross capture, net removal and stored tonnes differ; each figure uses its source's term. Prices are nominal and come from one buyer collective's disclosures; euro policy prices are converted at an assumed $1.16 per euro. We found no comparable, sourced cost per tonne for cutting cement or steel emissions, so those sectors are left off the price chart. Not investment advice.